Our Projects
Pleasant Run Trail
new pedestrian bridge being set in place by crane
450W Reconstruction
new box culvert crossing 450W and vertical curve correction
Northpointe team managed the design of ±1 mile road replacement to provide safe travel for bus traffic to new Center Grove School. Design included three vertical curve corrections, new box culvert, intersection at CR144, and added lane and shoulder widening on CR144. The Northpointe team provided right of way acquisition documents and managed utility relocations.
Gateway South Drainage Improvements
new detention facility
Northpointe team managed the design of complete drainage restoration to the Gateway south neighborhood on south side of Indianapolis. This included new storm sewer throughout residential streets, hybrid ditches, and complete road reconstruction for neighborhood streets. The Northpointe team lead the design, right of way acquisition, bidding, and permitting efforts.
Fishers Event Center
NPES provided construction layout for future event center that will also be the future home of the Indy Fuel minor league hockey team.
INDOT
CERTIFICATION
INDOT PREQUALIFICATION
6.1 Topographic Survey Data Collection
8.1 Non-Complex Roadway Design
11.1 R/W Plan Development and R/W Engineering
12.1 Project Management for Acquisition Services
13.1 Construction Inspection
16.1 Utility Coordination and Railroad Coordination Certified
Storm Water Management / SWPPP & SWQCP Plans & Inspection
INDOT Inspection Site Manager